Thurrock Kitchens and Bathrooms designs and builds kitchen extensions in Thurrock, from the first drawing to the final tap. One contract covers the planning checks, groundworks, RSJ steel beams, thermally broken aluminium roof lanterns, wet underfloor heating and the fitted kitchen, so there are no separate builders, electricians and fitters for you to line up. Rear, side-return and wraparound extensions all follow the same joined-up build sequence, with each trade handing over to the next.
The extra space only pays off if it is built for local conditions. Thames Estuary air is damp, which is why the new kitchen goes in on moisture-resistant MDF (MR-MDF) carcasses, and the structure gets proper damp proofing and cavity wall insulation. Most of our extensions take 10 to 16 weeks from groundworks to final finishes. After 20 years of building work across South Essex, we know where projects come unstuck, so permitted development limits, building control and sewer build-over agreements are checked before a spade goes in the ground.
Get a FREE Quote

Building out at the back is the simplest way to gain room for cooking, dining and everyday living. New foundations, walls, insulation, drainage and roof are tied into the existing house, and our designers plan the kitchen at the same time as the structure. Many single-storey rear extensions of up to 3 metres on an attached house, or 4 metres on a detached one, fall under permitted development.

An unused side passage can become valuable kitchen space when the property layout allows it. Side-return kitchen extensions make use of this narrow area while connecting the new structure to the existing house. We plan the foundations, roof, insulation, and drainage around the available footprint. The additional width creates more usable space for cabinets, worktops, and movement.

Joining a rear extension to a side return gives the largest footprint, with room for an island, dining table and bigger appliances. Thurrock Kitchens and Bathrooms coordinates the structural openings and the new roof with the existing building. Wraparound designs normally need full planning permission, so our drawings go to Thurrock Council before any work is booked.

Removing a load-bearing wall requires proper structural support before the new opening is formed. Structural steelwork installation may involve RSJ beams and padstones positioned according to the structural design. We coordinate the steelwork with the surrounding construction. This creates a properly supported opening for the extended kitchen layout.

A roof lantern brings natural daylight into areas of an extension that may otherwise feel enclosed. We install the lantern within the new roof structure with suitable insulation and weatherproof detailing around the opening. Thermally efficient glazing supports a more comfortable internal space. The extra daylight also gives the kitchen a brighter, more open feel.

Once the extension is ready, the kitchen installation brings the new space into everyday use. We coordinate cabinetry, worktops, plumbing, electrical work, flooring, and final fittings around the completed structure. This keeps the kitchen layout connected to the way the extension was built. The result is a fully fitted space ready for cooking, dining, and daily use.
The extension begins with the proposed layout, architectural drawings and structural requirements. Thurrock Kitchens and Bathrooms check the design against permitted development limits or apply for planning permission, and confirm the Building Regulations route before construction starts.
Groundworks prepare the site and form the foundations for the new structure. Drainage is rerouted where the new footprint crosses existing runs, and building control inspects the trenches before the concrete is poured.
Once the foundations are ready, the main structure takes shape with brickwork, blockwork, and roof construction. RSJ steel beams are installed where structural openings require additional support.


Plumbing and electrical work are installed before the walls and finishes are completed. Insulation, service routes, and other concealed work are dealt with at this stage so the internal fit-out has a prepared base.
The final stages bring the extension together with plastering, flooring, cabinetry, worktops, appliances, and other fittings. We coordinate the kitchen installation with the completed structure so the new space is ready for everyday cooking and use.


The cost of a kitchen extension built by Thurrock Kitchens and Bathrooms depends on the footprint, the complexity of the structural steel, the glazing (bifold doors and roof lanterns) and the level of kitchen fit-out.
Our 3 extension types, priced as a guide:
Our extension type | Guide price range | What you get |
|---|---|---|
Single-storey side-return | £35,000 – £55,000 | Infill build for Victorian/terraced homes, structural knock-through, flat rooflight, standard kitchen fit-out |
Standard single-storey rear | £45,000 – £75,000 | 3m–4m rear expansion, twin RSJ steel installation, aluminium bifold doors, roof lantern, full kitchen fitting |
Large wraparound extension | £75,000 – £115,000+ | Combined rear and side expansion, complex goalpost steel frame, underfloor heating, premium bespoke kitchen island build |
Several factors can push your costs higher or lower within these ranges. Soil depth affects foundation work, and some Thurrock plots require deeper footings due to ground conditions. If your drainage runs near or under a public sewer, you may need a build-over agreement, which adds time and cost. Wider architectural glazing spans, such as large bifold runs or full-width roof lanterns, increase both material and installation costs. Your choice of joinery tier, from standard units to bespoke cabinetry, also has a significant impact on the final figure.
These figures offer a useful starting point, but they cannot replace a proper site visit. For an accurate quotation, you'll need Thurrock Kitchen Studio to assess your boundary lines, drainage access, and load-bearing walls in person.
It depends. Many single-storey rear extensions fall under permitted development. We check your project against the Class A limits before work starts and tell you early if a planning application is needed.
Most projects managed by Thurrock Kitchen Studio take 10 to 16 weeks from groundworks to final finishes, depending on size and complexity.
Yes, Thurrock Kitchen Studio prepares and submits planning and building control applications on your behalf, so you don't need to deal with the council directly.
As a guide, a single-storey side-return extension costs £35,000 to £55,000 and a standard single-storey rear extension £45,000 to £75,000. A large wraparound extension runs from £75,000 to £115,000 or more, with your fixed price confirmed after the site visit.
Yes. Building control inspects the foundations, structure, insulation and drainage as we build, and the electrical work is certified under Part P. You receive the completion certificate at the end.
Not necessarily. Most homeowners stay in their property throughout, as Thurrock Kitchen Studio phases work to keep at least part of the kitchen usable where possible.